COVID-19 impact: Green energy installation trips in February, March

2020-05-03 18:11
Only 222 mw of solar capacity and 25 mw of wind capacity was installed in March as activities came to a halt following the Covid-19 outbreak, and installation would remain slow for another two months, said industry.